This article addresses the comparative analysis of current techniques for monitoring cable forces. Additionally, the experience of three cable force different monitoring techniques for strain control in bridge cables during the construction phase is included: a) installing load cells on the active anchorages of the cables, b) installing unidirectional strain gauges, and c) assessing the stress on cables by applying the vibrating wire technique through the installation of accelerometers. The main advantages and disadvantages of each technique analyzed are highlighted in the construction process context of the Tajo Viaduct, one of the most singular viaducts recently built in Spain.