Ahmed I, Charlesworth E. R (2015) An evaluation framework for assessing resilience of post-disaster housing. International Journal of Disaster Resilience in the Built Environment 6(3):300–312. doi: 10.1108/IJDRBE-11-2013-0042.
Akiyama H (2019) Who Rebuilds? Civil Society in Post-Disaster Recovery in China and Japan. Dissertation, George Mason University.
Altay N, Iii G.G (2006) Interfaces with Other Disciplines OR / MS research in disaster operations management. European Journal of Operational Research 175 (December 2004):475–493. doi: 10.1016/j.ejor.2005.05.016.
Mukherji A (2008) Negotiating Housing Recovery: Why Some Communities Recovered While Others Struggled to Rebuild in Post-Earthquake Urban Kutch, India, Curr. Biol. University of California. Available at: https://www.ncbi.nlm.nih.gov/pubmed/11516946%0Ahttps://linkinghub.elsevier.com/retrieve/pii/S0960-9822(01)00369-%0Ahttps://www.sciencedirect.com/science/article/pii/S0960982201003694%0Ahttps://ac.els-cdn.com/S0960982201003694/1-s2.0-S0960982201003694-mai.
Arain F (2015) Knowledge-based Approach for Sustainable Disaster Management: Empowering Emergency Response Management Team. Procedia Engineering. Elsevier B.V. 118(2015):232–239. doi: 10.1016/j.proeng.2015.08.422.
Celentano G. et al (2019) A matter of speed: The impact of material choice in post-disaster reconstruction. International Journal of Disaster Risk Reduction. Elsevier Ltd 34 (March 2018):34–44. doi: 10.1016/j.ijdrr.2018.10.026.
Chang Y, Wilkinson S, Seville E, Potangaroa R (2010) Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment 1(1):65–83. doi: 10.1108/17595901011026481.
Chang Y, Wilkinson S, Potangaroa R, Seville E (2011) Donor-driven resource procurement for post-disaster reconstruction: Constraints and actions. Habitat International 35(2):199–205. doi: 10.1016/j.habitatint.2010.08.003.
Chen Y, Booth D. C. (2011) The Wenchuan Earthquake of 2008 Anatomy of a Disaster. Zhurnal Eksperimental’noi i Teoreticheskoi Fiziki. doi: 10.1007/978-3-642-21159-1.
Cheng M. Y, Chiu K.C, Hsieh, Y.M, Yang I.T, Chou J.Sh, Wu Y.W (2017) BIM integrated smart monitoring technique for building fire prevention and disaster relief. Automation in Construction. Elsevier 84(August):14–30. doi: 10.1016/j.autcon.2017.08.027.
Cheng Y, He Zh, Xie Y, Deng H (2013) Modeling of Urban Post-disaster Reconstruction Using Extended Cellular Automata. In: International Conference on Geo-Informatics in Resource Management and Sustainable Ecosystem. Wuhan, 86–97.
CRED and UNISDR (2017) Economic losses, poverty & disasters 1998-2017, CRED UNISDR. Available at: http://www.albayan.ae.
Davidson C. H, Johnson C, Lizarralde G, Dikmen N, Sliwinski A (2007) Truths and myths about community participation in post-disaster housing projects. Habitat International 31(2007):100–115. doi: 10.1016/j.habitatint.2006.08.003.
Dhamangaonkar V (2019) Identification of Legal and Policy Barriers to Timely Post-Disaster Reconstruction and Strategy Development for Effective Recovery Processes in United States, ProQuest Dissertations and Theses. The University of Texas. doi: .1037//0033-2909.I26.1.78.
Yilmaz1D.G, Meding V.J, Erk G.K. (2013) A theoretical approach to the design of a survey instrument in post-disaster reconstruction: Defining indicators for a human-based study in rural built-environment. International Journal of Architectural Research 7(3): 40–56. Available at: http://web.b.ebscohost.com.pucdechile.idm.oclc.org/ehost/detail/detail?vid=0&sid=5946c3b9-c417-43fb-b7f6-4e88a838c75a%40pdc-v-sessmgr05&bdata=Jmxhbmc9ZXMmc2l0ZT1laG9zdC1saXZl#AN=97632884&db=asu.
Dikmen N, Tahira S.E.O (2016) Housing after disaster: A post occupancy evaluation of a reconstruction project. International Journal of Disaster Risk Reduction 19:167–178. doi: 10.1016/j.ijdrr.2016.08.020.
Dikmen, N, Tahira S.E.O and Davidson C (2012) Comparison Of Post-Disaster Housing Procurement Methods In Rural Areas Of Turkey. Open House International 37:28–39.
Du F, Okazaki K, Ochiai Ch, Kobayashi H (2016) Post-disaster building repair and retrofit in a disaster-prone historical village in China: A case study in Shangli, Sichuan. International Journal of Disaster Risk Reduction. Elsevier 16 (June 2016):142–157. doi: 10.1016/j.ijdrr.2016.02.007.
Dunford M, Li L (2011) Earthquake reconstruction in Wenchuan: Assessing the state overall plan and addressing the “Forgotten phase”. Applied Geography 998–1009. doi: 10.1016/j.apgeog.2011.01.001.
Edgington D. W (2011) Viewpoint: Reconstruction after natural disasters: The opportunities and constraints facing our cities. Town Planning Review. doi: 10.3828/tpr.2011.35.
Edgington D. W (2017) Building back better along the Sanriku coast of Tohoku, Japan: Five years after the “3/11” disaster. Town Planning Review. 615–638. doi: 10.3828/tpr.2017.38.
Enshassi A, Chatat T, Meding V.J, Forino G (2017) Factors Influencing Post-disaster Reconstruction Project Management for Housing Provision in the Gaza Strip, Occupied Palestinian Territories. International Journal of Disaster Risk Science. 8(4):402–414. doi: 10.1007/s13753-017-0155-4.
Etinay N, Egbu C, Murray, V (2018) Building Urban Resilience for Disaster Risk Management and Disaster for Risk Reduction. Procedia Engineering. Elsevier B.V.575–582. doi: 10.1016/j.proeng.2018.01.074.
Fayazi M, Arefian F.F, Gharaati M, Johnson C, Lizarralde G, Davidson C (2017) Managing institutional fragmentation and time compression in post-disaster reconstruction – the case of Bam. International Journal of Disaster Risk Reduction 21(September 2016):340–349. doi: 10.1016/j.ijdrr.2017.01.012.
Fayazi M, Yeh E. T, Li F. (2019) Development and divergent post-disaster trajectories in a mountain village: Temporal dynamics of differentiation after the 2008 Wenchuan earthquake. World Development. Elsevier Ltd, 124, p. 104663. doi: 10.1016/j.worlddev.2019.104663.
Flores S.A (2016) Evaluation of the Use of Lightweight Concrete Panels for Post Disaster House Reconstruction Using Building Information Modelling, PQDT - UK & Ireland. Dissertation. University of Manchester. Available at: http://proxy.library.vcu.edu/login?url=https://search.proquest.com/docview/2001176850?accountid=14780%0Ahttp://vcu-alma-primo.hosted.exlibrisgroup.com/openurl/VCU/vcu_services_page?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:dissertation&genre=di.
Ganapati N. E, Mukherji A (2014) Out of Sync: World bank funding for housing recovery, post-disaster planning, and participation. Natural Hazards Review 15(1):58–73. doi: 10.1061/(asce)nh.1527-6996.0000120.
Ge Y, Gu Y, Deng W. (2010) Evaluating China’s National Post-Disaster Plans: The 2008 Wenchuan Earthquake’s Recovery and Reconstruction Planning. International Journal of Disaster Risk Science 1(2):17–27. doi: 10.3974/j. issn. 2095-0055.2010.02.003 \RTICLt Evaluating.
Di Gregorio L. T, Soares C. A. P (2017) Post-disaster housing recovery guidelines for development countries based on experiences in the American continent. International Journal of Disaster Risk Reduction. Elsevier Ltd, 24(September 2017):340–347. doi: 10.1016/j.ijdrr.2017.06.027.
Griffey A. M (2010) Infrastructure Disaster Management : Insight From Small Business Leaders After A Mega Disaster . Dissertation. University of Phoenix.
Guarnacci U (2012) Governance for sustainable reconstruction after disasters: Lessons from Nias, Indonesia. Environmental Development. Elsevier 2(2012):73–85. doi: 10.1016/j.envdev.2012.03.010.
Guo Y (2012) Urban resilience in post-disaster reconstruction: Towards a resilient development in Sichuan, China. International Journal of Disaster Risk Science 3(1):45–55. doi: 10.1007/s13753-012-0006-2.
Haghani A, Afshar A. M (2010) Development of Advanced Applications Using Bluetooth-Generated Traffic Flow Data 2010 Annual Report Prepared by. Maryland.
Hallegatte S, Dumas P (2009) Can natural disasters have positive consequences? Investigating the role of embodied technical change. Ecological Economics. Elsevier B.V. 68(3):777–786. doi: 10.1016/j.ecolecon.2008.06.011.
Han Z (2014) From Vulnerability To Resilience : Long-Term Livelihood Recovery In Rural China After the 2008 Wenchuan Earthquake. Dissertation. University of Delaware.
Harrowell E, Özerdem A (2019) Understanding the dilemmas of integrating post-disaster and post-conflict reconstruction initiatives: Evidence from Nepal, Sri Lanka and Indonesia. International Journal of Disaster Risk Reduction. Elsevier Ltd 36(February):101092. doi: 10.1016/j.ijdrr.2019.101092.
He F, Zhuang J (2016) Balancing pre-disaster preparedness and post-disaster relief. European Journal of Operational Research. Elsevier B.V. 252(1):246–256. doi: 10.1016/j.ejor.2015.12.048.
He L (2019) Identifying local needs for post-disaster recovery in Nepal. World Development. Elsevier Ltd. 118(June 2019):52–62. doi: 10.1016/j.worlddev.2019.02.005.
Hidayat B, Egbu C (2010) A literature review of the role of project management in post-disaster reconstruction. In: Procs 26th Annual ARCOM Conference. Leeds, UK: Association of Researchers in Construction Management 1269–1278. Available at: http://usir.salford.ac.uk/10144/.
Hinzpeter K, Sandholz S (2018) Squaring the circle? Integrating environment, infrastructure and risk reduction in Post Disaster Needs Assessments. International Journal of Disaster Risk Reduction. Elsevier Ltd 32 (December 2018):113–124. doi: 10.1016/j.ijdrr.2018.05.016.
Howitt R, Okada T, McAneney J, Haynes K, Bird D (2018) Recovering local sociality: Learnings from post-disaster community-scale recoveries. International Journal of Disaster Risk Reduction. Elsevier Ltd 1030–1042. doi: 10.1016/j.ijdrr.2018.08.010.
Hu H, Lei T, Hu J, Zhang S, Kavan P (2018) Disaster-mitigating and general innovative responses to climate disasters: Evidence from modern and historical China. International Journal of Disaster Risk Reduction. Elsevier Ltd 28(June 2018):664–673. doi: 10.1016/j.ijdrr.2018.01.022.
Project Management Institute (2000) PMBOK® guide. 2000th edn, Project Management Institute, Inc. 2000th edn. doi: 10.1093/ajcp/69.5.475.
Ismail D, Taksiah M.A, Roosli R, Samah N.Ab (2014) Project Management Success for Post-disaster Reconstruction Projects: International NGOs Perspectives. Economics and Finance. Elsevier B.V. 120–127. doi: 10.1016/s2212-5671(14)00921-6.
Jigyasu R (2013) Long-term cultural impacts of disaster decision-making: The Case of Post Earthquake Reconstruction in Marathwada, India. International Journal of Architectural Research, 7(3), pp. 14–23. doi: 10.26687/archnet-ijar.v7i3.46.
Han J, Zhang P, Song Y (2019). The Construction of Emergency Management Whole Process Model Based on the Emergency Life-Cycle: Wenchuan Case Study. In: Tan H(ed) Technology for education and learning. Advances in Intelligent and Soft Computing. Poland: Springer 235–243. doi: 10.1017/CBO9781107415324.004.
Johnson C (2006) Strategic planning for temporary housing: 1999 earthquakes in Turkey. Dissertation. University of Montreal.
Johnson C, LizarraldeG (2012) Post-disaster housing and reconstruction. International Encyclopedia of Housing and Home. Elsevier, pp. 340–346. doi: 10.1016/B978-0-08-047163-1.00046-1.
Johnson K, Depietri YBreil, M (2016) Multi-hazard risk assessment of two Hong Kong districts. International Journal of Disaster Risk Reduction. Elsevier 19:311–323. doi: 10.1016/j.ijdrr.2016.08.023.
Jordan E (2012) Pathways to community recovery: A qualitative comparative analysis of post-disaster outcomes. Dissertation. University of Colorado.
Kermanshachi S, Bergstrand K, Rouhanizadeh, B (2019) Identifying , Weighting and Causality Modeling of Social and Economic Barriers To Rapid Infrastructure Recovery From Natural Disasters : a Study of Hurricanes Harvey, Irma and Maria. Texas. Available at: www.ctedd.uta.edu.
Kermanshachi S, Rouhanizadeh B. (2018) Feasibility Analysis of Post Disaster Reconstruction Alternatives Using Automated BIM-Based Construction Cost Estimation Tool. Building Tomorrow’s Society 1–10.
Kopaei M. G. (2009) Knowledge Transfer In Post-Disaster Reconstruction: The Problem of Post-post-disaster Reconstruction, ProQuest Dissertations and Theses. McGill University.
Li Q, Umaier K, Koide O (2019) Research on post-Wenchuan earthquake recovery and reconstruction implementation: A case study of housing reconstruction of Dujiangyan City. Progress in Disaster Science. The Author(s). Published by Elsevier Ltd. doi: 10.1016/j.pdisas.2019.100041.
Liao H, Yu J, Wu X, Al-Barakati A, Altalhi A, Herrera F (2019) Life satisfaction evaluation in earthquake-hit area by the probabilistic linguistic GLDS method integrated with the logarithm-multiplicative analytic hierarchy process. International Journal of Disaster Risk Reduction. Elsevier Ltd 38(May):101190. doi: 10.1016/j.ijdrr.2019.101190.
Liu L, Lin Y, Wang S. (2014) Urban design for post-earthquake reconstruction: A case study of Wenchuan county, china. Habitat International. Elsevier Ltd 41:290–299. doi: 10.1016/j.habitatint.2013.09.001.
Liu Z, Han Y (2009) Post-disaster reconstruction and social work development in the Chinese mainland. China Journal of Social Work 2(3):221–223. doi: 10.1080/17525090903211796.
Lizarralde G (2004) Organisational System and Performance of Post-Disaster Reconstruction Projects. Dissertation. Universite de Montreal.
Lu Y, Xu J (2015) Comparative Study on the Key Issues of Postearthquake Recovery and Reconstruction Planning: Lessons from the United States, Japan, Iran, and China. Natural Hazards Review 16(3):04014033-1–11. doi: 10.1061/(asce)nh.1527-6996.0000172.
Meding V.J, Oyedele L, Bruen J (2014) Linking Organisational Competency To Project Success In Post-Disaster Reconstruction. Open House International 39(3):7–16.
Moatty A (2017) Post-Flood Recovery: An Opportunity for Disaster Risk Reduction? In: Vinet F (ed) Floods. Elsevier Ltd 350–363. doi: 10.1016/B978-1-78548-269-4.50023-8.
Nejat A, Ghosh S (2016) LASSO Model of Postdisaster Housing Recovery: Case Study of Hurricane Sandy. Natural Hazards Review 17(3):04016007-1–13. doi: 10.1061/(asce)nh.1527-6996.0000223.
Okamoto K, Ishikawa Y (2013) Traditional Wisdom and Modern Knowledge for the Earth’s Future. In Noritaka Yagasaki J (ed). International L Geographical Union Kyoto Regional Conference. Kyoto: Springer.
Olshansky R. B (2006) Planning after Hurricane Katrina. Journal of the American Planning Association, 72(2):147–153. doi: 10.1080/01944360608976735.
Opdyke A (2017) Resilient and sustainable infrastructure systems: a comparative analysis of post-disaster shelter coordination, stakeholder participation, and training. ProQuest Dissertations and Theses. University of Colorado Boulder. doi: 10.1108/ijdrbe-10-2017-0060.
Patel S, Hastak M (2013) A framework to construct post-disaster housing. International Journal of Disaster Resilience in the Built Environment 4(1):95–114. doi: 10.1108/17595901311299026.
Ping Xu, Xiaoli Lu, K. Z. and H. Z. (2014) Post-Wenchuan Earthquake Reconstruction and Development in China. In: Kapucu N, Liou K.T (ed) Disaster and Development- Examining Global Issues and Cases. Disaster and Development. New York: Springer. doi: 10.1007/978-3-319-04468-2_25.
Platt S (2018) Factors Affecting the Speed and Quality of Post-Disaster Recovery and Resilience. Earthquake Engineering and Structural Dynamics in Memory of Ragnar Sigbjörnsson. Springer 369–403. doi: https://doi.org/10.1007/978-3-319-62099-2_19.
Powell P. J (2011) Post-disaster reconstruction: A current analysis of Gujarat’s response after the 2001 earthquake. Environmental Hazards 10(3):279–292. doi: 10.1080/17477891.2011.597839.
Rani, W. N. M. W. M, Nifa F.A.B, Ismail M.N, Khalid Kh. N (2017) Planning for post disaster recovery: Lesson learnt from flood events in Kelantan Malaysia. AIP Conference Proceedings. American Institute of Physics 0201431-1–6. doi: 10.1063/1.5005476.
Rehman J, Sohaib O, Asif M, Pradhan B (2019) Applying systems thinking to flood disaster management for a sustainable development. International Journal of Disaster Risk Reduction. Elsevier Ltd 36(February):101101. doi: 10.1016/j.ijdrr.2019.101101.
Robert O, Ikuo K, Kazuyoshi O. (2005) The Kobe Earthquake, Ten Years Later. Planning 71(9):36. Available at: http://search.ebscohost.com/login.aspx?direct=true&db=buh&AN=18483701&site=ehost-live.
Robert Olshansky (2002) Planning for disasters. Journal of the American Planning Association, 68(4):453.
Rose A (2011) Resilience and sustainability in the face of disasters. Environmental Innovation and Societal Transitions. Elsevier 1(1):96–100. doi: 10.1016/j.eist.2011.04.003.
Rouhanizadeh B, Kermanshachi Sh, Dhamangaonkar V.S (2013) Reconstruction of Critical and Interdependent Infrastructures due to Catastrophic Natural Disasters: Lessons Learned. Perspektif Pelajar Terhadap Kurikulum Sejarah Peringkat Menengah di Malaysia 1727.
Rouhanizadeh B, Bergstrand S (2019a) Comparative Analysis of Public’s and Decision-Maker’s Perspectives on Socioeconomic Barriers Causing Delay in Post-disaster Recovery Processes. in ASCE Construction Research Congress (CRC) 1–10.
Rouhanizadeh, B, Bergstrand S (2019b) Investigating the Relationships of Socioeconomic Factors Delaying Post-Disaster Reconstruction. ASCE International Conference on Computing in Civil Engineering 16–24. doi: 10.6224/JN.59.5.16.
Sadiqi Z, Trigunarsyah B Coffey V (2017) A framework for community participation in post-disaster housing reconstruction projects: A case of Afghanistan. International Journal of Project Management. Elsevier Ltd APM and IPMA, 35(5):900–912. doi: 10.1016/j.ijproman.2016.11.008.
Supernaw A.S (2019) Impact of Project Management Methodology Use in Post-Disaster Recovery and Mitigation Projects Dissertation. Northcentral University.
Silva J.D (2010) Lessons from Aceh. Key Considerations in Post-Disaster Reconstruction, Post-Disaster Reconstruction: Lessons from Aceh. Practical Action Publishing. doi: 10.4324/9781849775137.
Siriwardhana C, Hewage S, Deshabandu R, Siribaddana S, Sumathipala A (2012) Psychosocial and Ethical Response to Disasters: A SWOT Analysis of Post-Tsunami Disaster Management in Sri Lanka. Asian Bioethics Review 171–182. doi: 10.1353/asb.2012.0027.
Tanwattana P (2018) Systematizing Community-Based Disaster Risk Management (CBDRM): Case of urban flood-prone community in Thailand upstream area. International Journal of Disaster Risk Reduction. Elsevier Ltd 28(June 2018):798–812. doi: 10.1016/j.ijdrr.2018.02.010.
Tran T. A (2015) Post-disaster housing reconstruction as a significant opportunity to building disaster resilience: a case in Vietnam. Natural Hazards 61–79. doi: 10.1007/s11069-015-1826-3.
Vahanvati M, Mulligan M (2017) A new model for effective post-disaster housing reconstruction: Lessons from Gujarat and Bihar in India. International Journal of Project Management. Elsevier Ltd APM and IPMA 35(5): 802–817. doi: 10.1016/j.ijproman.2017.02.002.
Wu J. I. E. Y (2003) a Comparative Study of Housing Reconstruction After Two Major Earthquakes : the 1994 Northridge Earthquake in the United States and the 1999 Chi-Chi Earthquake in Taiwan, ProQuest Dissertations and Theses. Texas A&M University.
Xiao Y, Olshansky R, Zhang Y, Johnson L.A, Song Y (2019) Financing rapid community reconstruction after catastrophic disaster: lessons from the 2008 Wenchuan earthquake in China. Natural Hazards. Springer Netherlands (0123456789). doi: 10.1007/s11069-019-03789-9.
Xu H, Wang L, Li Y, Huang L, Yin, L (2019) Critical Chinese government behavior for swift housing reconstruction programme - The case of Dujiangyan following Wenchuan Earthquake. International Journal of Disaster Risk Reduction. Elsevier Ltd. doi: 10.1016/j.ijdrr.2019.101307.
Xu J, Lu Y (2012) Meta-synthesis pattern of post-disaster recovery and reconstruction: Based on actual investigation on 2008 Wenchuan earthquake. Natural Hazards 60(2):199–222. doi: 10.1007/s11069-011-0003-6.
Xu J, Lu Y (2018) Towards an earthquake-resilient world: from post-disaster reconstruction to pre-disaster prevention. Environmental Hazards 269–275. doi: 10.1080/17477891.2018.1500878.
Yang B (2011) A Comprehensive Study Of The Chinese Government’ S Natural Disaster Communication Framework Based On The Natural Disaster Management And Communication System’s Response To Two Natural Disasters. Dissertation. University of Southern California.
Zhang Y, Peacock W. G (2010) Planning for Housing recovery? Lessons learned from Hurricane Andrew. Journal of the American Planning Association 76(1):5–24. doi: 10.4324/9781351203319-13.
Zhao B, Taucer F, Rossetto T (2009) Field investigation on the performance of building structures during the 12 May 2008 Wenchuan earthquake in China. Engineering Structures. Elsevier Ltd 31(8):1707–1723. doi: 10.1016/j.engstruct.2009.02.039.